TLC Maynooth Campus

TLC Maynooth Campus

Project Team

Client: TLC Group

Architect: JNP Architects

Quantity Surveyor: David J. Turner & Associates

Structural Engineer: Tobin Consulting Engineers

Project Details

Contract Value:
€9.5m€5m (2008) + €0.5m (2011) + €4.0m (2016)

Floor Area:
Phase 1 – ??? | Phase 2 – 260m² | Phase 3 – 2,200m²

Duration:
Phase 1 – 12 months | Phase 2 – 6 months | Phase 3 – 10 months

Project Description

TLC Maynooth Campus is a 110-bedroom nursing home including an dementia unit and TLC Group head office located in Co. Kildare. This project was completed in three phases. The first phase consisted of the renovation, conversion and extension of an existing hotel to a 66-bed nursing home. Phase two involved the construction of the TLC Group head office building. The final third phase consisted of a 49-bedroom extension.

Project Information Points

  • Design & build, turn-key contract.
  • Phase One: 2008 Renovation, conversion & extension of existing building into a 66-bedroom nursing home
  • Phase Two: 2011 Construction of new Head Office building
  • Phase Three: 2016 Construction of new 49-bedroom nursing home extension.
  • Constructed to current HIQA requirements
  • Works included full nursing home fit-out including fixtures, fittings and equipment.
TLC Maynooth Campus
TLC Maynooth Campus
TLC Maynooth Campus