Edenmore Primary Care Centre

Tonlegee Road, Dublin 5
DJI_0576

Project Team

Client: Glencar Healthcare         

Architect: JNP Architects

Quantity Surveyor: Linesight

Structural Engineer: Muir Associates

M&E Consultant: Varming Consulting Engineers

Project Details

Contract Value:
€5.25m                 

Floor Area:
2,634 m²

Duration:
12 months

Project Description

The project involved the construction of a three-storey Primary Care Centre, incorporating the HSE primary care teams, GP surgery and some retail units at ground floor level. This design and build contract was completed in 2020 and included the construction of a new community all-weather sports pitch and an extension to Saint Monica’s Youth Club, located on the same site.

Project Information Points

  • Pre-cast concrete structure over3 floors.
  • Design and build contract.
  • HSE facility included specialist health treatment rooms and consultation areas.
  • Multi-stakeholder engagement with occupants (HSE, GP, Dublin City Council, St. Monica’s Youth Club).
EO7A5337
EO7A5077
EO7A5153

Completed Project Gallery

Construction Gallery